The Rain Has Finally Stopped

With the plans approved, we can really get started anytime we're ready. We have to at least do something within 6 months of the permit being granted. What we really have been waiting for is the rain to stop.

There is an area that we have to cross to get from the driveway to the shed site. Eventually the driveway will extend over to the shed, but for right now it's just a "field". In reality, it's an area where the previous owner logged the land and stripped the land of all vegetation and dirt. It's basically pure ledge. If there is any dirt, it's only an inch or so thick. So, with all the spring rain we had, and because there is so much ledge, giving the water no where to go, it's just a mud bowl.

We'll have to bring in fill to build this area up if the permanent driveway runs through it. In fact, we had plans just last weekend to start to bring in materials to do just that. Our plan was to get a temporary driveway in so that we could get concrete trucks over to the shed site and get going on the foundation. But then, of course, we ran into a problem.

No comments:

Post a Comment